What should i know about the post submission revision window the bid goes out th
1
The number you defended can still change, and you don't have to rebuilding, redoing the takeoff to keep up. BidLight keeps one live record of the project inside
add comment
Answers
0
<p>The number you defended can still change, and you don't have to rebuild the takeoff to keep up. BidLight keeps one live record of the project inside Revit and Navisworks. When the design moves, the costs re-price in minutes. Labor, equipment, material, and time update in real time.</p>
<p>The catch with a bid already out the door is the revision window. Here is what that actually looks like:</p>
<ol><li><strong>Export the model.</strong> Every export is versioned and diffed element by element, so you can see exactly what moved after the bid went out.</li><li><strong>Let the AI reclassify.</strong> Two AI models read geometry and metadata to classify BOQ line items at 86% accuracy.</li><li><strong>Pull current pricing.</strong> Pricing comes from a roughly $30,000 database plus Craftsman, 1Build, and RSMeans.</li><li><strong>Defend the delta.</strong> You show the owner or GC what changed and why the number moved, backed by the record, not a guess.</li></ol>
<p>Stop chasing scattered updates and re-doing takeoffs. Turn early estimates into a service you can bill for. Plans run from Basics at $260 per licence per year to Max at $590, with custom Enterprise pricing.</p>