What should i know about the moment the structural engineer swaps a beam size mo

1
When the engineer swaps a beam size, the change is on the record before the coordination call, because the record rides on the same model.
support@bidlight.com
asked 2 months agoSupport Team

Answers

0
<p>When the engineer swaps a beam size, the change is on the record before the coordination call, because the record rides on the same model. Swap the beam in Revit, publish, and the comparison shows it as a changed element under structural.</p> <p>What that means for your week:</p> <ul><li>The structural engineer swaps the beam size in the model.</li><li>You publish from Revit or Navisworks. Every publish is a versioned snapshot, and you compare revisions element by element to see exactly what moved.</li><li>Pin an issue to the beam, and to any duct, pipe or tray it now crowds. The issue carries the sheet and revision.</li><li>Assign owners. Each sees theirs in the 6am digest.</li><li>Your team walks into the coordination call already knowing what changed.</li></ul> <p>Instead of spending the meeting finding out who changed what, you spend it on decisions. About 15 minutes instead of a 90-minute meeting.</p>
support@bidlight.com
answered 1 month agoSupport Team

Your answer

Browse other questions tagged  or  ask your own question.