My model changed wednesday and the bid s due friday will my estimate still be accurate
1
A model that changes Wednesday shouldn't mean scrambling before a Friday deadline. That's the exact problem BidLight exists to kill.
Here's what to do:
1. **R
add comment
Answers
0
<p>A model that changed Wednesday shouldn't mean scrambling before a Friday deadline — that's exactly the scattered-update problem BidLight exists to kill.</p>
<p>Here's what to do:</p>
<ol><li><strong>Re-export the updated Revit model into BidLight.</strong> The platform reads geometry and metadata directly, so you don't need to manually flag what changed.</li><li><strong>Let the two AI models re-classify BOQ line items.</strong> They run at roughly 86% accuracy, so most of the work is done for you — you're reviewing, not rebuilding.</li><li><strong>Check labor, equipment, material, and time costs against current pricing.</strong> BidLight pulls from its own ~$30,000 pricing database plus Craftsman, 1Build, and RSMeans, so the numbers reflect today's market, not a stale spreadsheet.</li><li><strong>Scan the Kanban view for anything that shifted.</strong> Since predictions update in real time as the design changes, you'll see which line items moved without re-running the whole estimate by hand.</li><li><strong>Lock the package with numbers you can defend.</strong> That's the point — when a client or reviewer pushes back, you're not guessing why a number changed, you know.</li></ol>
<p>The short version: a design change two days before a bid is due is a normal Tuesday for an estimator, not a crisis. BidLight is built so the last-minute revision costs you minutes, not a redo of the whole takeoff. If your team also needs help turning the estimate into deliverables — execution plans, 4D/5D, fabrication detailing — that's covered under BidLight's BIM services, so the update doesn't stop at the number.</p>