How do i stop the back and forth between design and estimate
1
The ping-pong starts when your model changes and your estimate hasn't caught up. Someone shifts a wall, and the numbers you gave the client three days ago are a
add comment
Answers
0
<p>The ping-pong happens when your model changes and your estimate doesn't know it yet — someone moves a wall, and the numbers you handed the client three days ago are already wrong. Fixing that isn't about typing faster. It's about closing the loop between design and cost so they move together.</p>
<p>Here's how BidLight breaks it:</p>
<ol><li><strong>Work inside Revit, not around it.</strong> BidLight lives in Revit, so there's no export-to-spreadsheet detour that goes stale the moment someone opens the model again.</li><li><strong>Let geometry and metadata do the classifying.</strong> Two AI models read your model and classify BOQ line items automatically, at roughly 86% accuracy, instead of a person eyeballing quantities.</li><li><strong>Price against a real database, not last quarter's numbers.</strong> Costs pull from a ~$30,000 pricing database plus Craftsman, 1Build, and RSMeans, so labor, equipment, material, and time reflect current markets.</li><li><strong>Update in real time.</strong> When the design changes, the estimate changes with it — no re-running a takeoff to catch up.</li><li><strong>Treat the early number as a deliverable.</strong> With a defensible, current estimate on hand, you can package it as a service and bill for it instead of giving it away as a courtesy.</li></ol>
<p>The result: fewer rounds of "let me re-check that against the latest drawings," and more time spent deciding whether to bid, not reconciling numbers.</p>