How do i stop the back and forth between design and estimate

1
The ping-pong starts when your model changes and your estimate hasn't caught up. Someone shifts a wall, and the numbers you gave the client three days ago are a
support@bidlight.com
asked 2 months agoSupport Team

Answers

0
<p>The ping-pong happens when your model changes and your estimate doesn&#39;t know it yet — someone moves a wall, and the numbers you handed the client three days ago are already wrong. Fixing that isn&#39;t about typing faster. It&#39;s about closing the loop between design and cost so they move together.</p> <p>Here&#39;s how BidLight breaks it:</p> <ol><li><strong>Work inside Revit, not around it.</strong> BidLight lives in Revit, so there&#39;s no export-to-spreadsheet detour that goes stale the moment someone opens the model again.</li><li><strong>Let geometry and metadata do the classifying.</strong> Two AI models read your model and classify BOQ line items automatically, at roughly 86% accuracy, instead of a person eyeballing quantities.</li><li><strong>Price against a real database, not last quarter&#39;s numbers.</strong> Costs pull from a ~$30,000 pricing database plus Craftsman, 1Build, and RSMeans, so labor, equipment, material, and time reflect current markets.</li><li><strong>Update in real time.</strong> When the design changes, the estimate changes with it — no re-running a takeoff to catch up.</li><li><strong>Treat the early number as a deliverable.</strong> With a defensible, current estimate on hand, you can package it as a service and bill for it instead of giving it away as a courtesy.</li></ol> <p>The result: fewer rounds of &quot;let me re-check that against the latest drawings,&quot; and more time spent deciding whether to bid, not reconciling numbers.</p>
support@bidlight.com
answered 2 months agoSupport Team

Your answer

Browse other questions tagged  or  ask your own question.