Can real time pricing help you cut project costs

1
One design change and your takeoffs reset. You redo the work, pad quotes because you can't lock in a number. Add your team's loaded rate, the reviewer's time, e
support@bidlight.com
asked 2 months agoSupport Team

Answers

0
<p>More than the hour on the clock. The real bill is the rework behind it.</p> <p>Think about what a manual takeoff actually pulls in. Your estimator&#39;s time. The senior review that follows. Then the redo when the design changes and yesterday&#39;s quantities no longer match the model. One scope tweak and you are chasing scattered updates across sheets again, paying for the same takeoff twice.</p> <p>There is the slower cost too. Every hour spent counting is an hour not spent on bids you could win. Quotes that go out late, or go out padded because nobody had time to sharpen the number.</p> <p>Here is the math worth running for your own firm:</p> <ol><li>Take the loaded hourly rate of whoever does the takeoff.</li><li>Add the reviewer&#39;s time checking it.</li><li>Count how many times that takeoff gets redone per project when the design shifts.</li><li>Multiply by the bids you skip because the team is buried in counts.</li></ol> <p>That total is the honest number, and it is bigger than the hour.</p> <p>This is the headache BidLight was built for. You export your Revit model and get labor, equipment, material, and time costs in minutes, with two AI models classifying BOQ line items at 86% accuracy. When the design changes, the number updates in real time, so you are not redoing the takeoff, you are reading the new total.</p> <p>So the hour costs you whatever your team bills, plus the rework, plus the work you turned away. The point is to stop paying it.</p>
support@bidlight.com
answered 1 month agoSupport Team

Your answer

Browse other questions tagged  or  ask your own question.