Can bidlight catch clashes before they hit the field
1
It's not clash detection in the traditional sense. BidLight doesn't flag MEP-vs-structural collisions. What it does is keep your cost model honest as the design
add comment
Answers
0
<p>Not quite clash detection in the traditional sense. BidLight isn't a coordination tool that flags MEP-vs-structural collisions. What it does is keep your cost model honest as the design changes, so budget problems surface the moment they happen instead of after you've built and re-taken-off the whole thing.</p>
<p>Here's how it actually works:</p>
<ul><li>You export your Revit model into BidLight.</li><li>Two AI models read the geometry and metadata and classify BOQ line items at 86% accuracy.</li><li>Pricing comes in from BidLight's own database of roughly $30,000 in current rates, plus Craftsman, 1Build, and RSMeans.</li><li>You get labor, equipment, material, and time costs back in minutes, not days.</li><li>When the architect or engineer changes the design, your estimate updates in real time. No re-running takeoffs from scratch.</li></ul>
<p>That real-time link is the real win. The moment a wall moves or a spec changes, you see the cost impact immediately, not three weeks later when someone's reconciling the budget against the latest drawing set. That's what stops the "surprise in the budget" problem: you're never estimating against a stale model.</p>
<p>If you also need geometric clash checking (MEP routing, structural conflicts), that sits outside BidLight's core estimation product. What BidLight does own is making sure your numbers never fall behind the design, so you catch cost overruns before they hit the field, not after.</p>